0822-8999-3998Book Now

Training Process & Acceptance Standards

Six majors, each with a step-by-step work process and quality standards used as the reference for the online self-test and field work assessment.

Residential Electrical Installation

4 weeks · Rp 2.000.000
Online Self-Test

Work Process

  1. Site survey: mark positions of lights, switches and sockets

    Use a tape measure and chalk line to mark the height of every point: switches at 130 cm, sockets at 40 cm, bed-side switches aligned with the bed edge. One missed point means re-chasing the wall.

  2. Conduit installation: chase and run conduits per PUIL, power & data separated

    Fix conduits with clips every 80 cm so they do not sag. Keep power and data lines at least 30 cm apart; wrap data conduits with foil where they cross to avoid signal interference.

  3. Wiring & termination: tight terminals, live-neutral-earth clearly separated

    Strip insulation max 1 cm and crimp terminals until they pass a pull test. Keep colours consistent: live red/brown, neutral blue, earth yellow-green. Mixed colours make future maintenance unreadable.

  4. Panel assembly: install MCB per circuit group and label each group

    Size each MCB to its load: lighting 6A, sockets 16A, a dedicated 16A for AC. Label every group inside the panel so a tripped breaker can be traced at a glance.

  5. Earthing test: measure earth and insulation resistance

    Use a 500V insulation tester between conductors and to earth; reading must be at least 0.5 MΩ. Measure earthing resistance with an earth tester, standard ≤4 Ω. Do not proceed to live testing if this fails.

  6. Live test: energize circuit by circuit, check function and panel temperature

    Energize circuits one by one and test every point with a voltage pen. After 30 minutes touch the MCB surface: warm is normal, abnormally hot means switch off immediately and trace the fault.

Acceptance Standards

Tiling & Plastering

4 weeks · Rp 2.200.000
Online Self-Test

Work Process

  1. Base preparation: clean dust & oil, remove loose parts

    Scrape off dust and grease, chip out loose sections and re-plaster. A weak base will peel off whole tiles no matter how well they are laid.

  2. Set out & layout: establish reference lines and joint pattern

    Start the layout from the main wall seen on entry, putting cut tiles in hidden corners. Snap cross reference lines so rows stay true over distance.

  3. Dry fit: match pattern and direction, arrange tight joints

    Dry-fit first to check colour variation and pattern direction, including under artificial light. Pre-view all cut tiles in hidden areas.

  4. Tile fixing: thin-bed method, press fully until mortar squeezes out

    Thin-bed fixing: comb the mortar evenly with no voids, press and rub until mortar squeezes into joints. Check flatness with a straightedge and tap with a rubber mallet as you go.

  5. Grout & cure: clean joints, grout neatly, protect from vibration for 24 h

    After 24 h clean the joints and grout, removing all spacers. Cure for 24 h with no vibration or load — disturbed grout cracks easily.

  6. Clean & handover: clean surface, protect finished work

    Wipe off grout haze with a wet sponge and cover the surface until handover. Scratched new tiles during finishing works are the most common dispute.

Acceptance Standards

Professional Painting

2 weeks · Rp 1.200.000
Online Self-Test

Work Process

  1. Protect the area: cover glass, doors, floors and fixed items

    Cover glass, doors, floors and fixed furniture with masking film. Good protection lets you work fast without fear of stains.

  2. Base check: repair cracks, scrape off peeling paint

    Bridge cracks with mesh tape and scrape flaking paint back to solid wall. A crack merely painted over reappears within 2–3 months.

  3. Putty: 1–2 leveling coats, sand after drying

    Apply 1–2 coats of putty, let it cure hard, sand with 240 grit. Check for waves with side lighting — the fastest way to find uneven spots.

  4. Primer: roll anti-alkali primer evenly

    Roll the anti-alkali primer evenly with no missed spots. Skipping primer causes alkali stains on the topcoat that extra coats cannot fix.

  5. Top coat: 1–2 coats, cross-rolling technique

    Finish with 1–2 coats using cross (W) rolling, keeping roller loading even. Join areas while the paint is still wet to avoid lap marks.

  6. Clean & inspect: remove covers, check even color

    Peel masking tape right after the paint skins over, pulling slowly at 45°. Check colour consistency in both daylight and lamplight.

Acceptance Standards

Aluminium Frames & Windows

3 weeks · Rp 1.800.000
Online Self-Test

Work Process

  1. Re-measure: confirm opening sizes and swing direction

    Measure opening width and height at 3 points (top-middle-bottom) plus diagonals. Diagonal error over 5 mm means fix the opening first — even a precise frame will never sit true.

  2. Cut profiles: cut per shop drawing, square ends

    Use a fine-tooth blade and cut each 45° mitre in one pass. File the cut edges smooth so assembled corners close tight.

  3. Corner assembly: crimp with corner machine and inject corner adhesive

    Crimp corners with a corner machine and inject corner adhesive. Run a finger over the joint: no step allowed. White gaps are filled with tinted adhesive before crimping.

  4. Install hardware: hinges, locking points, rollers

    Tighten every hinge screw fully with no stripping, lock points aligned with strike plates. Adjust rollers until sliding is smooth with no jumping or noise.

  5. Set into opening: level & plumb correction, solid anchoring

    Once level and plumb, anchor the frame with expansion bolts or fixing plates and fill the gap fully. A loose frame invalidates the whole installation.

  6. Test & handover: smooth operation, sealed with silicone

    Operate 20 cycles smoothly, silicone inside and out continuous and full. Keep the unit unloaded and dry for the first 48 h so adhesive cures properly.

Acceptance Standards

Prefab Partition & Ceiling

3 weeks · Rp 1.900.000
Online Self-Test

Work Process

  1. Set out lines: wall position and ceiling height lines

    Chalk the wall position on floor and ceiling, mark ceiling height with a level and keep it continuous around the room. A skewed start line skews the whole ceiling.

  2. Frame installation: edge, main & furring channels, level corrected

    Install edge frames first, main channels spaced max 1200 mm. Tighten and adjust every hanger with a level; an uneven frame means uneven panels, period.

  3. Concealed services: run conduits first and inspect

    Run and live-test all wiring before closing the boards. Once gypsum is on, changing a run means opening panels all over again.

  4. Board fixing: gypsum/PVC boards staggered, screw spacing per spec

    Fix gypsum panels offset (brick pattern), never in line. Screws: 150 mm from edges, 200 mm in the field, heads slightly recessed without tearing the paper.

  5. Jointing: joint tape then joint compound

    Fill joints with compound and embed paper tape while compacting, then apply a second coat. Two boards butted in line without tape will crack, guaranteed.

  6. Final preparation: sanded smooth, ready for paint

    Spot-prime screws with anti-rust paint, skim flat, then sand with 240 grit until side lighting shows no shadows.

Acceptance Standards

AC Service & Installation

2 weeks · Rp 1.500.000
Online Self-Test

Work Process

  1. Position survey: confirm indoor/outdoor unit locations and drain route

    Indoor unit away from right above the bed (drips and noise), outdoor unit needs 30 cm of ventilation clearance. Condensate line slopes to a drain, not hanging mid-wall.

  2. Bracket installation: drill and fix brackets, level and solid

    Anchor brackets with full expansion bolts and stand on them to confirm zero movement. Corroded brackets are the number-one cause of falling outdoor units.

  3. Pipe connection: flare copper pipes, route pipework neatly

    Flare copper pipes with a proper flaring tool: the flare rim must be smooth and crack-free. Bend with a bender, never by hand — hand bends kink and restrict flow.

  4. Vacuum: vacuum at least 15 minutes, hold pressure

    Vacuum at least 15 minutes to -0.1 MPa and hold: a steady needle means leak-free. Any rise means a leak — find it before charging refrigerant.

  5. Test run: charge refrigerant by weight, measure air temperature split

    Charge refrigerant to nameplate spec (or by pressure/superheat), then measure the inlet-outlet air temperature difference. Below standard means the charge is off.

  6. Handover: explain usage and maintenance schedule

    Show remote use and filter-cleaning cycles, hand over the warranty card, and dress the pipe run with cable ties. A tidy pipe run is the showcase of installation quality.

Acceptance Standards

Failed the self-test? You may retake it anytime. A result above 80% helps the training team schedule your class.